Honouring specific energy and air requirements in a highly-sensitive environmental location.
DOOLIN COAST GUARD STATION
DOOLIN COAST
GUARD STATION
- Client: Office of Public Works
- Budget: Confidential
- Size: 420m²
- Stage: Complete
For the Doolin Coast Guard Station (CGS) project in Co. Clare, we were engaged as Main Contractor and Project Supervisor Construction Stage (PSCS). As the site is in a scenic and special area of conservation, construction methodology involved minimal interference with existing Burren rock where possible. The building was also designed to achieve a high energy rating with minimum air leakage.